Skip to content

EIP-4895: Beacon chain push withdrawals as operations #10264

EIP-4895: Beacon chain push withdrawals as operations

EIP-4895: Beacon chain push withdrawals as operations #10264

Re-run triggered August 26, 2024 09:59
Status Failure
Total duration 1h 40m 26s
Artifacts

test-pr.yml

on: pull_request
Code Quality Checks
31s
Code Quality Checks
Matrix: Nix
Matrix: test-prove
Fit to window
Zoom out
Zoom in

Annotations

9 errors and 1 warning
Conformance Tests
RPC failed; curl 92 HTTP/2 stream 0 was not closed cleanly: CANCEL (err 8)
Conformance Tests
7816 bytes of body are still expected
Conformance Tests
early EOF
Conformance Tests
fetch-pack: invalid index-pack output
Conformance Tests
clone of 'https://github.com/ethereum/tests.git' into submodule path '/home/github-runner/actions-runner/_work/evm-semantics/evm-semantics/tests/ethereum-tests' failed
Proofs: Rules (booster-dev)
Process completed with exit code 2.
Proofs: DSS
Process completed with exit code 2.
Proofs: Rules (booster)
The job running on runner github-runner-25 has exceeded the maximum execution time of 100 minutes.
Proofs: Rules (booster)
The operation was canceled.
Nix (macos-13)
No push credentials found. Ignoring the 'useDaemon' option.