Skip to content

chore: Refactor node.mjs #2438

chore: Refactor node.mjs

chore: Refactor node.mjs #2438

Triggered via pull request October 11, 2024 09:35
Status Cancelled
Total duration 10m 27s
Artifacts 32
Set Environment Variables  /  Set Environment Variables
0s
Set Environment Variables / Set Environment Variables
Code Style  /  Standard
19s
Code Style / Standard
Update README.md  /  update
4m 36s
Update README.md / update
E2E Tests  /  Integration
1m 13s
E2E Tests / Integration
E2E Tests  /  Standard
4m 59s
E2E Tests / Standard
E2E Tests  /  Mirror Node
2m 15s
E2E Tests / Mirror Node
E2E Tests  /  Node PEM Stop
8m 28s
E2E Tests / Node PEM Stop
E2E Tests  /  Node PEM Kill
8m 28s
E2E Tests / Node PEM Kill
E2E Tests  /  Node Local Build
4m 15s
E2E Tests / Node Local Build
E2E Tests  /  Node Add
2m 23s
E2E Tests / Node Add
E2E Tests  /  Node Add - Separate commands
3m 12s
E2E Tests / Node Add - Separate commands
E2E Tests  /  Node Update
3m 34s
E2E Tests / Node Update
E2E Tests  /  Node Delete
4m 2s
E2E Tests / Node Delete
E2E Tests  /  Node Delete - Separate commands
4m 5s
E2E Tests / Node Delete - Separate commands
E2E Tests  /  Node Upgrade
3m 12s
E2E Tests / Node Upgrade
E2E Tests  /  Relay
2m 46s
E2E Tests / Relay
Matrix: Unit Tests / unit-test
Waiting for pending jobs
Codacy  /  analyze
Codacy / analyze
CodeCov  /  analyze
CodeCov / analyze
Fit to window
Zoom out
Zoom in

Annotations

10 errors and 2 warnings
Code Style / Standard
Process completed with exit code 1.
E2E Tests / Mirror Node
Process completed with exit code 1.
E2E Tests / Node Add
No files were found with the provided path: junit-e2e-node-add.xml. No artifacts will be uploaded.
E2E Tests / Node Add
Process completed with exit code 1.
E2E Tests / Node Update
Process completed with exit code 1.
E2E Tests / Standard
Process completed with exit code 1.
E2E Tests / Node PEM Kill
Canceling since a higher priority waiting request for 'pr-checks-PR Checks-00619-refactor-nodemjs' exists
E2E Tests / Node PEM Kill
The operation was canceled.
E2E Tests / Node PEM Stop
Canceling since a higher priority waiting request for 'pr-checks-PR Checks-00619-refactor-nodemjs' exists
E2E Tests / Node PEM Stop
The operation was canceled.
E2E Tests / Node Add
This job uses deprecated functionality from the 'gradle/gradle-build-action' action. Consult the Job Summary for more details.
E2E Tests / Node Local Build
This job uses deprecated functionality from the 'gradle/gradle-build-action' action. Consult the Job Summary for more details.

Artifacts

Produced during runtime
Name Size
E2E Integration Tests Coverage Report
1.23 MB
E2E Mirror Node Tests Coverage Report
1.3 MB
E2E Node Add - Separate commands Tests Coverage Report
1.31 MB
E2E Node Add Tests Coverage Report
1.19 MB
E2E Node Delete - Separate commands Tests Coverage Report
1.31 MB
E2E Node Delete Tests Coverage Report
1.31 MB
E2E Node Local Build Tests Coverage Report
1.31 MB
E2E Node Update Tests Coverage Report
1.3 MB
E2E Node Upgrade Tests Coverage Report
1.31 MB
E2E Relay Tests Coverage Report
1.3 MB
E2E Standard Tests Coverage Report
1.34 MB
e2e_test_report_test-e2e-integration
267 Bytes
e2e_test_report_test-e2e-mirror-node
740 Bytes
e2e_test_report_test-e2e-node-add-separate-commands
633 Bytes
e2e_test_report_test-e2e-node-delete
586 Bytes
e2e_test_report_test-e2e-node-delete-separate-commands
637 Bytes
e2e_test_report_test-e2e-node-local-build
732 Bytes
e2e_test_report_test-e2e-node-update
735 Bytes
e2e_test_report_test-e2e-node-upgrade
591 Bytes
e2e_test_report_test-e2e-relay
571 Bytes
e2e_test_report_test-e2e-standard
2.11 KB
solo-test-e2e-integration.log
8.47 KB
solo-test-e2e-mirror-node.log
218 KB
solo-test-e2e-node-add-separate-commands.log
601 KB
solo-test-e2e-node-add.log
2.52 KB
solo-test-e2e-node-delete-separate-commands.log
1000 KB
solo-test-e2e-node-delete.log
1 MB
solo-test-e2e-node-local-build.log
714 KB
solo-test-e2e-node-update.log
399 KB
solo-test-e2e-node-upgrade.log
586 KB
solo-test-e2e-relay.log
550 KB
solo-test-e2e-standard.log
1.93 MB