[cosim] support cycle counters (#521) #2208
pr.yml
on: pull_request
Generate test plan
4s
Test elaborate
21s
Matrix: Build Emulators
Matrix: Build trace emulator
Request physical design report
0s
Matrix: Run testcases
Report CI result
0s
Clean test reports [CANCELLED]
3s
Annotations
10 errors
Build trace emulator (sandslash)
Canceling since a higher priority waiting request for 'PR-522' exists
|
Build trace emulator (sandslash)
The operation was canceled.
|
Build Emulators (machamp)
Canceling since a higher priority waiting request for 'PR-522' exists
|
Build trace emulator (machamp)
Canceling since a higher priority waiting request for 'PR-522' exists
|
Build Emulators (machamp)
The operation was canceled.
|
Build trace emulator (machamp)
The operation was canceled.
|
Build Emulators (sandslash)
Canceling since a higher priority waiting request for 'PR-522' exists
|
Build Emulators (sandslash)
The operation was canceled.
|
Build trace emulator (blastoise)
Canceling since a higher priority waiting request for 'PR-522' exists
|
Build trace emulator (blastoise)
The operation was canceled.
|