Skip to content

chore(deps): update dependency coveralls to v4 #712

chore(deps): update dependency coveralls to v4

chore(deps): update dependency coveralls to v4 #712

Triggered via push August 21, 2024 01:45
Status Failure
Total duration 41s
Artifacts

test.yml

on: push
Matrix: integration-test
Matrix: unit-test
Fit to window
Zoom out
Zoom in

Annotations

12 errors
unit-test (3.9)
Process completed with exit code 1.
integration-test (8.3.13)
Process completed with exit code 1.
unit-test (3.8)
The job was canceled because "_3_9" failed.
unit-test (3.8)
Process completed with exit code 1.
unit-test (3.10)
The job was canceled because "_3_9" failed.
unit-test (3.12)
The job was canceled because "_3_9" failed.
unit-test (3.11)
The job was canceled because "_3_9" failed.
unit-test (3.11)
The operation was canceled.
integration-test (8.2.29)
The job was canceled because "_8_3_13" failed.
integration-test (8.2.29)
Process completed with exit code 1.
integration-test (8.5.5)
The job was canceled because "_8_3_13" failed.
integration-test (8.4.9)
The job was canceled because "_8_3_13" failed.