Maintenance #1996
This run and associated checks have been archived and are scheduled for deletion.
Learn more about checks retention
siibra-testing.yml
on: push
Matrix: check-importable
Matrix: e2e-tests
Matrix: unit-tests
Annotations
10 errors
check-importable (3.7)
Process completed with exit code 1.
|
unit-tests (3.7)
Process completed with exit code 1.
|
e2e-tests (ubuntu-latest, 3.7)
Process completed with exit code 2.
|
e2e-tests (windows-latest, 3.7)
Process completed with exit code 2.
|
e2e-tests (ubuntu-latest, 3.9)
The run was canceled by @AhmetNSimsek.
|
e2e-tests (ubuntu-latest, 3.9)
The operation was canceled.
|
e2e-tests (ubuntu-latest, 3.10)
The run was canceled by @AhmetNSimsek.
|
e2e-tests (ubuntu-latest, 3.10)
The operation was canceled.
|
e2e-tests (ubuntu-latest, 3.8)
The run was canceled by @AhmetNSimsek.
|
e2e-tests (ubuntu-latest, 3.8)
The operation was canceled.
|