Skip to content
Triggered via schedule October 6, 2024 00:51
Status Failure
Total duration 2m 51s
Artifacts

ci.yml

on: schedule
Matrix: Checks
Matrix: Linux Integration
Matrix: Tests
Matrix: Windows Integration
Report required job statuses
0s
Report required job statuses
Fit to window
Zoom out
Zoom in

Annotations

23 errors
Checks (macos-latest)
Process completed with exit code 101.
Checks (ubuntu-latest)
The job was canceled because "macos-latest" failed.
Checks (ubuntu-latest)
The operation was canceled.
Tests (macos-latest)
Process completed with exit code 101.
Timings
Process completed with exit code 101.
Tests (windows-latest)
The job was canceled because "macos-latest" failed.
Tests (windows-latest)
The operation was canceled.
Linux Integration (ubuntu-22.04, v2.0.0-beta.2)
Process completed with exit code 101.
Linux Integration (ubuntu-22.04, v1.6.28)
The job was canceled because "ubuntu-22_04_v2_0_0-beta_" failed.
Linux Integration (ubuntu-22.04, v1.6.28)
The operation was canceled.
Linux Integration (ubuntu-20.04, v1.6.28)
The job was canceled because "ubuntu-22_04_v2_0_0-beta_" failed.
Linux Integration (ubuntu-20.04, v1.6.28)
The operation was canceled.
Linux Integration (ubuntu-20.04, v2.0.0-beta.2)
The job was canceled because "ubuntu-22_04_v2_0_0-beta_" failed.
Linux Integration (ubuntu-20.04, v2.0.0-beta.2)
The operation was canceled.
Tests (ubuntu-latest)
The job was canceled because "macos-latest" failed.
Tests (ubuntu-latest)
The operation was canceled.
Linux Integration (ubuntu-20.04, v1.7.13)
The job was canceled because "ubuntu-22_04_v2_0_0-beta_" failed.
Linux Integration (ubuntu-20.04, v1.7.13)
The operation was canceled.
Linux Integration (ubuntu-22.04, v1.7.13)
The job was canceled because "ubuntu-22_04_v2_0_0-beta_" failed.
Linux Integration (ubuntu-22.04, v1.7.13)
The operation was canceled.
Windows Checks
Process completed with exit code 1.
Windows Integration (windows-latest, 1.7.0)
Process completed with exit code 1.
Report required job statuses
Process completed with exit code 1.