Zingo sync transparent #5082
ci.yaml
on: pull_request
cargo-checkmate
/
Cache checkmate
3s
test
/
Build test artifacts
8m 24s
Reject trailing whitespace
5s
Run doc tests
2m 0s
Matrix: cargo-checkmate / Cargo checkmate
Matrix: test / Run tests
Annotations
7 errors
cargo-checkmate / Cargo checkmate (clippy)
Process completed with exit code 101.
|
cargo-checkmate / Cargo checkmate (build)
The job was canceled because "clippy" failed.
|
cargo-checkmate / Cargo checkmate (build)
The operation was canceled.
|
cargo-checkmate / Cargo checkmate (doc)
The job was canceled because "clippy" failed.
|
cargo-checkmate / Cargo checkmate (doc)
The operation was canceled.
|
cargo-checkmate / Cargo checkmate (check)
The job was canceled because "clippy" failed.
|
cargo-checkmate / Cargo checkmate (check)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
nextest-archive
|
572 MB |
|