Skip to content

Zingo sync transparent #5082

Zingo sync transparent

Zingo sync transparent #5082

Triggered via pull request November 25, 2024 07:44
Status Failure
Total duration 16m 9s
Artifacts 1

ci.yaml

on: pull_request
cargo-checkmate  /  Cache checkmate
3s
cargo-checkmate / Cache checkmate
test  /  Build test artifacts
8m 24s
test / Build test artifacts
Reject trailing whitespace
5s
Reject trailing whitespace
Run doc tests
2m 0s
Run doc tests
Matrix: cargo-checkmate / Cargo checkmate
Matrix: test / Run tests
Fit to window
Zoom out
Zoom in

Annotations

7 errors
cargo-checkmate / Cargo checkmate (clippy)
Process completed with exit code 101.
cargo-checkmate / Cargo checkmate (build)
The job was canceled because "clippy" failed.
cargo-checkmate / Cargo checkmate (build)
The operation was canceled.
cargo-checkmate / Cargo checkmate (doc)
The job was canceled because "clippy" failed.
cargo-checkmate / Cargo checkmate (doc)
The operation was canceled.
cargo-checkmate / Cargo checkmate (check)
The job was canceled because "clippy" failed.
cargo-checkmate / Cargo checkmate (check)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
nextest-archive
572 MB