smoke test for FiniteVolume and Smoldyn #90
pip.yml
on: pull_request
Matrix: Build with Pip
Publish to PyPI
0s
Annotations
36 errors
Build with Pip (ubuntu-latest, 3.9)
The job running on runner GitHub Actions 17 has exceeded the maximum execution time of 360 minutes.
|
Build with Pip (ubuntu-latest, 3.9)
Process completed with exit code 1.
|
Build with Pip (ubuntu-latest, 3.9)
The operation was canceled.
|
Build with Pip (ubuntu-latest, 3.12)
The job running on runner GitHub Actions 6 has exceeded the maximum execution time of 360 minutes.
|
Build with Pip (ubuntu-latest, 3.12)
Process completed with exit code 1.
|
Build with Pip (ubuntu-latest, 3.12)
The operation was canceled.
|
Build with Pip (macos-13, 3.11)
The job running on runner GitHub Actions 28 has exceeded the maximum execution time of 360 minutes.
|
Build with Pip (macos-13, 3.11)
The operation was canceled.
|
Build with Pip (macos-13, 3.11)
Process completed with exit code 127.
|
Build with Pip (macos-13, 3.10)
The job running on runner GitHub Actions 32 has exceeded the maximum execution time of 360 minutes.
|
Build with Pip (macos-13, 3.10)
Process completed with exit code 127.
|
Build with Pip (macos-13, 3.10)
The operation was canceled.
|
Build with Pip (ubuntu-latest, 3.10)
The job running on runner GitHub Actions 41 has exceeded the maximum execution time of 360 minutes.
|
Build with Pip (ubuntu-latest, 3.10)
Process completed with exit code 1.
|
Build with Pip (ubuntu-latest, 3.10)
The operation was canceled.
|
Build with Pip (ubuntu-latest, 3.11)
The job running on runner GitHub Actions 12 has exceeded the maximum execution time of 360 minutes.
|
Build with Pip (ubuntu-latest, 3.11)
Process completed with exit code 1.
|
Build with Pip (ubuntu-latest, 3.11)
The operation was canceled.
|
Build with Pip (macos-14, 3.10)
The job running on runner GitHub Actions 59 has exceeded the maximum execution time of 360 minutes.
|
Build with Pip (macos-14, 3.10)
Process completed with exit code 1.
|
Build with Pip (macos-14, 3.10)
The operation was canceled.
|
Build with Pip (macos-13, 3.9)
The job running on runner GitHub Actions 42 has exceeded the maximum execution time of 360 minutes.
|
Build with Pip (macos-13, 3.9)
Process completed with exit code 127.
|
Build with Pip (macos-13, 3.9)
The operation was canceled.
|
Build with Pip (macos-13, 3.12)
The job running on runner GitHub Actions 18 has exceeded the maximum execution time of 360 minutes.
|
Build with Pip (macos-13, 3.12)
The operation was canceled.
|
Build with Pip (macos-13, 3.12)
Process completed with exit code 127.
|
Build with Pip (macos-14, 3.11)
The job running on runner GitHub Actions 25 has exceeded the maximum execution time of 360 minutes.
|
Build with Pip (macos-14, 3.11)
Process completed with exit code 1.
|
Build with Pip (macos-14, 3.11)
The operation was canceled.
|
Build with Pip (macos-14, 3.12)
The job running on runner GitHub Actions 52 has exceeded the maximum execution time of 360 minutes.
|
Build with Pip (macos-14, 3.12)
Process completed with exit code 1.
|
Build with Pip (macos-14, 3.12)
The operation was canceled.
|
Build with Pip (macos-14, 3.9)
The job running on runner GitHub Actions 46 has exceeded the maximum execution time of 360 minutes.
|
Build with Pip (macos-14, 3.9)
Process completed with exit code 1.
|
Build with Pip (macos-14, 3.9)
The operation was canceled.
|