Documentation/git-merge-tree.txt: document -X #20
main.yml
on: push
config
3s
fuzz smoke test
32s
static-analysis
3m 30s
sparse
5m 17s
documentation
3m 47s
Matrix: dockerized
Matrix: regular
Matrix: win+VS test
Matrix: win test
Annotations
12 errors
linux-reftable-leaks (ubuntu-latest)
Canceling since a higher priority waiting request for 'linux-reftable-leaks-ubuntu-latest-refs/heads/vdye/merge-tree-strategy-option' exists
|
linux-reftable-leaks (ubuntu-latest)
The operation was canceled.
|
linux-leaks (ubuntu-latest)
Canceling since a higher priority waiting request for 'linux-leaks-ubuntu-latest-refs/heads/vdye/merge-tree-strategy-option' exists
|
linux-leaks (ubuntu-latest)
The operation was canceled.
|
linux-asan-ubsan (ubuntu-latest)
Canceling since a higher priority waiting request for 'linux-asan-ubsan-ubuntu-latest-refs/heads/vdye/merge-tree-strategy-option' exists
|
linux-asan-ubsan (ubuntu-latest)
The operation was canceled.
|
osx-clang (macos-13)
Canceling since a higher priority waiting request for 'osx-clang-macos-13-refs/heads/vdye/merge-tree-strategy-option' exists
|
osx-clang (macos-13)
The operation was canceled.
|
osx-reftable (macos-13)
Canceling since a higher priority waiting request for 'osx-reftable-macos-13-refs/heads/vdye/merge-tree-strategy-option' exists
|
osx-reftable (macos-13)
The operation was canceled.
|
osx-gcc (macos-13)
Canceling since a higher priority waiting request for 'osx-gcc-macos-13-refs/heads/vdye/merge-tree-strategy-option' exists
|
osx-gcc (macos-13)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
windows-artifacts
Expired
|
112 MB |
|