Skip to content

Update fixture

Update fixture #57

Triggered via push October 29, 2024 07:46
Status Failure
Total duration 1m 26s
Artifacts

tests.yml

on: push
Matrix: build-20
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

15 errors
build (7.2)
Process completed with exit code 1.
build (8.1)
Process completed with exit code 1.
build (8.0)
The job was canceled because "_7_2" failed.
build (8.0)
Process completed with exit code 1.
build (7.3)
The job was canceled because "_7_2" failed.
build (7.3)
Process completed with exit code 1.
build (7.4)
The job was canceled because "_7_2" failed.
build (7.4)
The operation was canceled.
build (8.2)
The job was canceled because "_7_2" failed.
build (8.2)
The operation was canceled.
build (8.3)
The job was canceled because "_7_2" failed.
build (8.3)
The operation was canceled.
build-20 (8.0)
Process completed with exit code 1.
build-20 (7.3)
The job was canceled because "_8_0" failed.
build-20 (7.3)
The operation was canceled.