get datums using pallas observer #27
ci.yml
on: pull_request
Matrix: test
Matrix: build
check
1m 39s
build-test-wasm
52s
build-ubuntu-X64
3m 59s
Matrix: deploy-testing
Annotations
12 errors
build-test-wasm
Process completed with exit code 1.
|
check
Dependency review is not supported on this repository. Please ensure that Dependency graph is enabled along with GitHub Advanced Security on private repositories, see https://github.com/txpipe/mithril/settings/security_analysis
|
publish-tests-results
Canceling since a higher priority waiting request for 'ci-build-test-refs/pull/1/merge' exists
|
publish-tests-results
The operation was canceled.
|
run-test-lab (thales, 3, --use-p2p-network)
Canceling since a higher priority waiting request for 'ci-build-test-refs/pull/1/merge' exists
|
run-test-lab (thales, 3, --use-p2p-network)
The operation was canceled.
|
run-test-lab (thales, 2)
Canceling since a higher priority waiting request for 'ci-build-test-refs/pull/1/merge' exists
|
run-test-lab (thales, 2)
The operation was canceled.
|
run-test-lab (thales, 1)
Canceling since a higher priority waiting request for 'ci-build-test-refs/pull/1/merge' exists
|
run-test-lab (thales, 1)
The operation was canceled.
|
run-test-lab (thales, 3)
Canceling since a higher priority waiting request for 'ci-build-test-refs/pull/1/merge' exists
|
run-test-lab (thales, 3)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
mithril-deb-packages-Linux-X64
Expired
|
19 MB |
|
mithril-distribution-Linux-X64
Expired
|
184 MB |
|
mithril-distribution-Windows-X64
Expired
|
12.7 MB |
|
mithril-distribution-macOS-X64
Expired
|
66.5 MB |
|
mithril-end-to-end-Linux-X64
Expired
|
11.6 MB |
|
test-results-Linux-X64
Expired
|
146 KB |
|
test-results-Windows-X64
Expired
|
7.74 KB |
|
test-results-macOS-X64
Expired
|
7.94 KB |
|