Milestone 1 - v1.0.0: Plan and Status

Tasks to Complete

  1. Determine release date
  • Sat Wed 20, 2019?
  1. Confirm scope is accurate
  2. Process pull request to pull the issue branch into v1.0.0-dev for tile mill
  3. Process pull request to pull the issue branch into v1.0.0-dev for gh-pages
  4. Update README.md for release
  • Update dependency references
  • Links to CHANGELOG and Roadmap
  1. Determine final testing to be done
  • Perhaps lots of ad-hoc testing is adequate, in addition to the standard mocha tests
  1. Figure out release process (versioning, branches, etc)
  • Pull v1.0.0-dev into Master
  • Create v1.0.0 tag
  • Publish v1.0.0 as a release
  • Pull v1.0.0-dev into gh-pages
  1. Verify that documentation is now the new documentation
  2. Do a fresh install and run from the v1.0.0 release as a final test

Schedule

  • Release Date:
  • Testing Dates: