Skip to content

All post-commit tests #2181

All post-commit tests

All post-commit tests #2181

Manually triggered January 19, 2024 23:53
Status Failure
Total duration 5h 19m 8s
Artifacts 4

all-post-commit-workflows.yaml

on: workflow_dispatch
Matrix: run-eager-package-main / build-eager-package
static-checks  /  check-spdx-licenses
39s
static-checks / check-spdx-licenses
static-checks  /  check-metal-kernel-count
6s
static-checks / check-metal-kernel-count
static-checks  /  check-black
12s
static-checks / check-black
static-checks  /  check-doc
10s
static-checks / check-doc
Matrix: build-and-test-measure-perf-device / build-and-test-measure-device-perf
Matrix: build-and-test-measure-perf / build-and-test-measure-perf
Matrix: build-and-unit-tests-fast-dispatch / build-and-unit-tests-fast-dispatch
Matrix: build-and-unit-tests / build-and-unit-tests
Matrix: run-profiler-regression / run-profiler-regression
Matrix: run-eager-package-main / test-eager-package-host
Matrix: run-eager-package-main / test-eager-package-silicon
Fit to window
Zoom out
Zoom in

Annotations

4 errors
build-and-unit-tests / build-and-unit-tests (grayskull, grayskull)
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
build-and-unit-tests / build-and-unit-tests (grayskull, grayskull)
The operation was canceled.
build-and-unit-tests / build-and-unit-tests (grayskull, grayskull)
Process completed with exit code 134.

Artifacts

Produced during runtime
Name Size
device-perf-report-csv-grayskull-bare_metal Expired
1.95 KB
eager-dist-ubuntu-20.04-grayskull Expired
721 MB
eager-dist-ubuntu-20.04-wormhole_b0 Expired
721 MB
perf-report-csv-grayskull-bare_metal Expired
4.26 KB