Skip to content

All post-commit tests #1426

All post-commit tests

All post-commit tests #1426

Manually triggered December 6, 2023 21:17
Status Failure
Total duration 2h 34m 1s
Artifacts 4

all-post-commit-workflows.yaml

on: workflow_dispatch
Matrix: run-eager-package-main / build-eager-package
static-checks  /  check-syseng-assets-dev
13s
static-checks / check-syseng-assets-dev
static-checks  /  check-syseng-assets-release
8s
static-checks / check-syseng-assets-release
static-checks  /  check-spdx-licenses
57s
static-checks / check-spdx-licenses
static-checks  /  check-metal-kernel-count
6s
static-checks / check-metal-kernel-count
static-checks  /  check-black
20s
static-checks / check-black
Matrix: build-and-test-measure-perf-device / build-and-test-measure-device-perf
Matrix: build-and-test-measure-perf / build-and-test-measure-perf
Matrix: build-and-unit-tests-fast-dispatch / build-and-unit-tests-fast-dispatch
Matrix: build-and-unit-tests / build-and-unit-tests
Matrix: run-profiler-regression / run-profiler-regression
Matrix: run-eager-package-main / test-eager-package-host
Matrix: run-eager-package-main / test-eager-package-silicon
Fit to window
Zoom out
Zoom in

Annotations

2 errors
build-and-unit-tests / build-and-unit-tests (grayskull, grayskull)
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
build-and-unit-tests / build-and-unit-tests (grayskull, grayskull)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
eager-dist-ubuntu-20.04-grayskull Expired
690 MB
eager-dist-ubuntu-20.04-wormhole_b0 Expired
690 MB
perf-report-csv-grayskull-bare_metal Expired
2.71 KB
perf-report-csv-grayskull-virtual_machine Expired
2.14 KB