All post-commit tests #1411
all-post-commit-workflows.yaml
on: workflow_dispatch
Matrix: run-eager-package-main / build-eager-package
static-checks
/
check-syseng-assets-dev
9s
static-checks
/
check-syseng-assets-release
8s
static-checks
/
check-spdx-licenses
58s
static-checks
/
check-metal-kernel-count
10s
static-checks
/
check-black
14s
Matrix: build-and-test-measure-perf-device / build-and-test-measure-device-perf
Matrix: build-and-test-measure-perf / build-and-test-measure-perf
Matrix: build-and-unit-tests-fast-dispatch / build-and-unit-tests-fast-dispatch
Matrix: build-and-unit-tests / build-and-unit-tests
Matrix: run-profiler-regression / run-profiler-regression
Matrix: run-eager-package-main / test-eager-package-host
Matrix: run-eager-package-main / test-eager-package-silicon
Annotations
7 errors
build-and-test-measure-perf / build-and-test-measure-perf (grayskull, model-runner-grayskull, virtual_machine)
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
|
build-and-test-measure-perf / build-and-test-measure-perf (grayskull, model-runner-grayskull, virtual_machine)
The operation was canceled.
|
build-and-unit-tests-fast-dispatch / build-and-unit-tests-fast-dispatch (grayskull, grayskull)
The self-hosted runner: tt-metal-ci-vm-13 lost communication with the server. Verify the machine is running and has a healthy network connection. Anything in your workflow that terminates the runner process, starves it for CPU/Memory, or blocks its network access can cause this error.
|
build-and-unit-tests / build-and-unit-tests (grayskull, grayskull)
The self-hosted runner: tt-metal-ci-vm-11 lost communication with the server. Verify the machine is running and has a healthy network connection. Anything in your workflow that terminates the runner process, starves it for CPU/Memory, or blocks its network access can cause this error.
|
run-eager-package-main / test-eager-package-silicon (ubuntu-20.04, grayskull)
Process completed with exit code 139.
|
run-eager-package-main / test-eager-package-silicon (ubuntu-20.04, wormhole_b0)
The job was canceled because "ubuntu-20_04_grayskull" failed.
|
run-eager-package-main / test-eager-package-silicon (ubuntu-20.04, wormhole_b0)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
eager-dist-ubuntu-20.04-grayskull
Expired
|
684 MB |
|
eager-dist-ubuntu-20.04-wormhole_b0
Expired
|
684 MB |
|
perf-report-csv-grayskull-bare_metal
Expired
|
2.71 KB |
|