# Case Study: Fervo Project Cape 3: Extrapolation from Fervo results pre-published 2024-09-10 at
# https://eartharxiv.org/repository/view/7665/ to 400MWe capacity.
# Norbeck J., -- Gradl C., and Latimer T. 2024.
# Norbeck J., Gradl C., and Latimer T. 2024.
# "Deployment of Enhanced Geothermal System technology leads to rapid cost reductions and performance improvements."
# https://doi.org/10.31223/X5VH8C

Reservoir Model, 1
Reservoir Volume Option, 1
Reservoir Density, 2800
Expand All @@ -11,13 +12,16 @@ Reservoir Heat Capacity, 790
Reservoir Thermal Conductivity, 3.05
Reservoir Porosity, 0.0118
Reservoir Impedance, 0.001

Number of Fractures, 149
Fracture Shape, 4
Fracture Height, 2000
Fracture Width, 10000
Fracture Separation, 30

Number of Segments, 1
Gradient 1, 74, -- temperature at 8500 ft: 200 degC (https://pangea.stanford.edu/ERE/db/GeoConf/papers/SGW/2024/Fercho.pdf); 228.89 degC @ 9824 ft (https://doi.org/10.31223/X5VH8C)

Number of Injection Wells, 39
Number of Production Wells, 39
Production Flow Rate per Well, 120, -- peak flow reported in paper
Expand All @@ -38,8 +42,9 @@ End-Use Option, 1
Plant Lifetime, 20
Power Plant Type, 2
Circulation Pump Efficiency, 0.80

Exploration Capital Cost, 30
Well Drilling and Completion Capital Cost, 3.84,
Well Drilling and Completion Capital Cost, 3.84, -- Assume cost continues to decrease from $4.8M/well (https://houston.innovationmap.com/fervo-energy-drilling-utah-project-2667300142.html)
Reservoir Stimulation Capital Cost, 234, -- 78 wells @ $3M/well
Economic Model, 3
Starting Electricity Sale Price, 0.15
Expand All @@ -57,6 +62,7 @@ Inflation Rate During Construction, 0.05
Property Tax Rate, 0
Time steps per year, 10
Maximum Temperature, 500

Surface Plant Capital Cost Adjustment Factor, 0.71, -- $1900/kW (peak production)
Well Geometry Configuration, 4
Has Nonvertical Section, True