Skip to content

Update docs for Bolt12SemanticError::InvalidAmount #32

Update docs for Bolt12SemanticError::InvalidAmount

Update docs for Bolt12SemanticError::InvalidAmount #32

Triggered via push August 27, 2024 02:22
Status Failure
Total duration 6h 0m 35s
Artifacts

build.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
benchmark
unable to access 'https://github.com/slanesuke/rust-lightning/': Failed to connect to github.com port 443 after 134865 ms: Connection timed out
incremental-mutants
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
incremental-mutants
The operation was canceled.
build (windows-latest, 1.63.0)
The job running on runner GitHub Actions 3 has exceeded the maximum execution time of 360 minutes.
build (windows-latest, 1.63.0)
The operation was canceled.