Skip to content

Direction générale de la Comptabilité publique et du Trésor (www.sentresor.org) #16

Direction générale de la Comptabilité publique et du Trésor (www.sentresor.org)

Direction générale de la Comptabilité publique et du Trésor (www.sentresor.org) #16

Triggered via issue April 14, 2024 08:36
Status Failure
Total duration 21s
Artifacts

track-down.yml

on: issues
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

4 errors and 6 warnings
build (14.x)
Docker build failed with exit code 1
build (12.x)
Docker build failed with exit code 1
build (10.x)
The job was canceled because "_14_x" failed.
build (10.x)
Docker build failed with exit code 1
build (14.x)
Docker build failed with exit code 1, back off 5.47 seconds before retry.
build (14.x)
Docker build failed with exit code 1, back off 2.825 seconds before retry.
build (12.x)
Docker build failed with exit code 1, back off 1.927 seconds before retry.
build (12.x)
Docker build failed with exit code 1, back off 4.317 seconds before retry.
build (10.x)
Docker build failed with exit code 1, back off 5.873 seconds before retry.
build (10.x)
Docker build failed with exit code 1, back off 2.665 seconds before retry.