Skip to content

Merge commit '6be2ef9107e05ff46174f27bd50d56cbf208bb18' into refactor… #47

Merge commit '6be2ef9107e05ff46174f27bd50d56cbf208bb18' into refactor…

Merge commit '6be2ef9107e05ff46174f27bd50d56cbf208bb18' into refactor… #47

Triggered via push November 17, 2023 08:08
Status Cancelled
Total duration 7m 27s
Artifacts

ci-build.yml

on: push
Matrix: Fedora
Matrix: MacOS
Matrix: Ubuntu
Matrix: Windows
Fit to window
Zoom out
Zoom in

Annotations

31 errors
MacOS (macos-12, 1.73)
Process completed with exit code 101.
MacOS (macos-13, 1.73)
The job was canceled because "macos-12_1_73" failed.
MacOS (macos-12, 1.71)
The job was canceled because "macos-12_1_73" failed.
MacOS (macos-12, 1.71)
The operation was canceled.
MacOS (macos-13, 1.72)
The job was canceled because "macos-12_1_73" failed.
MacOS (macos-13, 1.72)
The operation was canceled.
MacOS (macos-13, 1.71)
The job was canceled because "macos-12_1_73" failed.
MacOS (macos-12, 1.72)
The job was canceled because "macos-12_1_73" failed.
MacOS (macos-13, 1.71)
The operation was canceled.
MacOS (macos-12, 1.72)
The operation was canceled.
Ubuntu (ubuntu-22.04, 1.73)
Process completed with exit code 101.
Ubuntu (ubuntu-20.04, 1.71)
The job was canceled because "ubuntu-22_04_1_73" failed.
Ubuntu (ubuntu-20.04, 1.71)
The operation was canceled.
Ubuntu (ubuntu-20.04, 1.73)
The job was canceled because "ubuntu-22_04_1_73" failed.
Ubuntu (ubuntu-20.04, 1.73)
The operation was canceled.
Ubuntu (ubuntu-22.04, 1.71)
The job was canceled because "ubuntu-22_04_1_73" failed.
Ubuntu (ubuntu-22.04, 1.71)
The operation was canceled.
Ubuntu (ubuntu-22.04, 1.72)
The job was canceled because "ubuntu-22_04_1_73" failed.
Ubuntu (ubuntu-22.04, 1.72)
The operation was canceled.
Ubuntu (ubuntu-20.04, 1.72)
The job was canceled because "ubuntu-22_04_1_73" failed.
Ubuntu (ubuntu-20.04, 1.72)
The operation was canceled.
Fedora (1.72)
Process completed with exit code 101.
Fedora (1.73)
The job was canceled because "_1_72" failed.
Fedora (1.73)
Process completed with exit code 101.
Fedora (1.71)
The job was canceled because "_1_72" failed.
Fedora (1.71)
Process completed with exit code 101.
Windows (1.72)
Canceling since a higher priority waiting request for 'Continuous integration-refs/heads/refactor/sdk_preview' exists
Windows (1.73)
Canceling since a higher priority waiting request for 'Continuous integration-refs/heads/refactor/sdk_preview' exists
Windows (1.72)
The operation was canceled.
Windows (1.73)
The operation was canceled.
Windows (1.71)
The operation was canceled.