Skip to content

Merge pull request #14 from realshouzy/pre-commit-ci-update-config #153

Merge pull request #14 from realshouzy/pre-commit-ci-update-config

Merge pull request #14 from realshouzy/pre-commit-ci-update-config #153

Triggered via push December 3, 2024 11:21
Status Failure
Total duration 1m 17s
Artifacts

pylint.yaml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

9 errors and 1 warning
build (3.10)
Process completed with exit code 8.
build (3.9)
The job was canceled because "_3_10" failed.
build (3.9)
The operation was canceled.
build (3.12)
The job was canceled because "_3_10" failed.
build (3.12)
The operation was canceled.
build (3.11)
The job was canceled because "_3_10" failed.
build (3.11)
The operation was canceled.
build (3.8)
The job was canceled because "_3_10" failed.
build (3.8)
The operation was canceled.
build (3.10)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636