Skip to content

Merge pull request #13 from realshouzy/pre-commit-ci-update-config #150

Merge pull request #13 from realshouzy/pre-commit-ci-update-config

Merge pull request #13 from realshouzy/pre-commit-ci-update-config #150

Triggered via push November 5, 2024 09:35
Status Failure
Total duration 1m 32s
Artifacts

pylint.yaml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

9 errors
build (3.10)
Process completed with exit code 8.
build (3.9)
The job was canceled because "_3_10" failed.
build (3.9)
A task was canceled.
build (3.11)
The job was canceled because "_3_10" failed.
build (3.11)
The operation was canceled.
build (3.12)
The job was canceled because "_3_10" failed.
build (3.12)
The operation was canceled.
build (3.8)
The job was canceled because "_3_10" failed.
build (3.8)
The operation was canceled.