nightly #1048
nightly.yml
on: schedule
Spec
/
Setup Test Matrix
41s
Matrix: Spec / spec
Matrix: Acceptance / acceptance
Annotations
4 errors
Acceptance / Acceptance tests (CentOS-8, puppet7-nightly)
The job running on runner GitHub Actions 47 has exceeded the maximum execution time of 180 minutes.
|
Acceptance / Acceptance tests (CentOS-8, puppet7-nightly)
The operation was canceled.
|
Acceptance / Acceptance tests (CentOS-8, puppet8-nightly)
The job running on runner GitHub Actions 54 has exceeded the maximum execution time of 180 minutes.
|
Acceptance / Acceptance tests (CentOS-8, puppet8-nightly)
The operation was canceled.
|