nightly #1028
This run and associated checks have been archived and are scheduled for deletion.
Learn more about checks retention
nightly.yml
on: schedule
Spec
/
Setup Test Matrix
50s
Matrix: Spec / spec
Matrix: Acceptance / acceptance
Annotations
6 errors
Acceptance / Acceptance tests (AlmaLinux-8, puppet7-nightly)
The job running on runner GitHub Actions 14 has exceeded the maximum execution time of 180 minutes.
|
Acceptance / Acceptance tests (AlmaLinux-8, puppet7-nightly)
The operation was canceled.
|
Acceptance / Acceptance tests (Rocky-8, puppet7-nightly)
The job running on runner GitHub Actions 94 has exceeded the maximum execution time of 180 minutes.
|
Acceptance / Acceptance tests (Rocky-8, puppet7-nightly)
The operation was canceled.
|
Acceptance / Acceptance tests (CentOS-8, puppet7-nightly)
The job running on runner GitHub Actions 24 has exceeded the maximum execution time of 180 minutes.
|
Acceptance / Acceptance tests (CentOS-8, puppet7-nightly)
The operation was canceled.
|