Skip to content

Timeline Workspace #293

Timeline Workspace

Timeline Workspace #293

Triggered via pull request December 23, 2024 07:17
@puffyCidpuffyCid
synchronize #211
timelining
Status Cancelled
Total duration 2m 21s
Artifacts

pullrequest.yml

on: pull_request
Matrix: build-pr
Fit to window
Zoom out
Zoom in

Annotations

6 errors
build-pr (windows-latest, x86_64-pc-windows-msvc, false)
The run was canceled by @puffyCid.
build-pr (windows-latest, x86_64-pc-windows-msvc, false)
The operation was canceled.
build-pr (ubuntu-latest, x86_64-unknown-linux-gnu, false)
The run was canceled by @puffyCid.
build-pr (ubuntu-latest, x86_64-unknown-linux-gnu, false)
The operation was canceled.
build-pr (macos-latest, aarch64-apple-darwin, false)
The run was canceled by @puffyCid.
build-pr (macos-latest, aarch64-apple-darwin, false)
The operation was canceled.