Skip to content

Fix fire request

Fix fire request #113

Triggered via push October 2, 2023 15:20
Status Cancelled
Total duration 3m 55s
Artifacts 1

run-tests.yml

on: push
Matrix: Integration and Unit tests
Acceptance tests
45s
Acceptance tests
Fit to window
Zoom out
Zoom in

Annotations

9 errors
Acceptance tests
Process completed with exit code 1.
Integration and Unit tests (1.17.13)
The run was canceled by @github-actions.
Integration and Unit tests (1.17.13)
Process completed with exit code 1.
Integration and Unit tests (1.16.15)
The run was canceled by @github-actions.
Integration and Unit tests (1.16.15)
Process completed with exit code 1.
Integration and Unit tests (1.19.4)
The run was canceled by @github-actions.
Integration and Unit tests (1.19.4)
Process completed with exit code 1.
Integration and Unit tests (1.18.9)
The run was canceled by @github-actions.
Integration and Unit tests (1.18.9)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
acceptance-test-reports Expired
67.8 KB