test: fix broken tests #35
push_main.yml
on: push
build
/
Build
19s
test
/
Lint
16s
test
/
Test (unit)
14s
test
/
Test (e2e)
10s
Matrix: test / Test (integration)
deploy
/
Build and Push to Dockerhub
Annotations
8 errors
test / Test (integration) (^1.10)
Process completed with exit code 17.
|
test / Test (integration) (^1.11)
Process completed with exit code 17.
|
test / Test (integration) (^1.12)
The job was canceled because "_1_11" failed.
|
test / Test (integration) (^1.12)
Process completed with exit code 17.
|
test / Test (integration) (latest)
The job was canceled because "_1_11" failed.
|
test / Test (integration) (latest)
Process completed with exit code 17.
|
test / Test (integration) (^1.13)
The job was canceled because "_1_11" failed.
|
test / Test (integration) (^1.13)
The operation was canceled.
|