Skip to content
Triggered via push April 28, 2024 19:09
Status Failure
Total duration 1m 8s
Artifacts

push_main.yml

on: push
Matrix: test / Test (integration)
deploy  /  Build and Push to Dockerhub
deploy / Build and Push to Dockerhub
Fit to window
Zoom out
Zoom in

Annotations

8 errors
test / Test (integration) (^1.11)
Process completed with exit code 15.
test / Test (integration) (^1.10)
Process completed with exit code 15.
test / Test (integration) (^1.13)
The job was canceled because "_1_10" failed.
test / Test (integration) (^1.13)
Process completed with exit code 15.
test / Test (integration) (latest)
The job was canceled because "_1_10" failed.
test / Test (integration) (latest)
Process completed with exit code 15.
test / Test (integration) (^1.12)
The job was canceled because "_1_10" failed.
test / Test (integration) (^1.12)
The operation was canceled.