CodeQL (daily) #968
codeql-daily.yml
on: schedule
analyze
1h 30m
workflow-notification
/
workflow-notification
6s
Annotations
3 warnings
analyze
`tools: latest` has been renamed to `tools: linked`, but the old name is still supported for now. No action is required.
|
analyze
Failed to download action 'https://api.github.com/repos/actions/setup-java/tarball/8df1039502a15bceb9433410b1a100fbe190c53b'. Error: The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.
|
analyze
Back off 12.624 seconds before retry.
|