Skip to content

Commit

Permalink
Last protocol updates
Browse files Browse the repository at this point in the history
  • Loading branch information
franklywatson authored Nov 15, 2024
1 parent 7dcd367 commit 0057b62
Showing 1 changed file with 6 additions and 1 deletion.
Original file line number Diff line number Diff line change
Expand Up @@ -152,6 +152,9 @@ Cycle Objective(s):
- [EFM Integration Test Part 2 ](https://github.com/onflow/flow-go/pull/6424)
- [Node ejected before epoch recovery](https://github.com/onflow/flow-go/pull/6632)
- [Create integration test where DKG and consensus committees form a symmetric difference](https://github.com/onflow/flow-go/issues/6645)
- [Benchnet testing EFM recovery](https://github.com/onflow/flow-go/issues/5945)
- [Investigating service event verification bug revealed by Benchnet testing](https://github.com/onflow/flow-go/issues/6622)
- Finding a resolution which is low-enough effort and also compatible with HCU upgrade

* <ins>Data Availability</ins>
- KROK Team
Expand Down Expand Up @@ -180,6 +183,8 @@ Cycle Objective(s):
* <ins>EFM Recovery</ins>
- Wrap up outstanding PRs currently under review
- [Implement last planned integration test](https://github.com/onflow/flow-go/issues/6645)
- Resolving the VN events chunk verification [bug](https://github.com/onflow/flow-go/issues/6622). Still some uncertainly on which approach we will take.
- Resume Benchnet testing

* <ins>Data Availability</ins>

Expand All @@ -202,7 +207,7 @@ Cycle Objective(s):

**Done last sprint**
* Update Hyperlane validators to latest version and confirmed path to launch
* Diagnosed rate limit issue that was blocking Snag when using Flow EVM
* Diagnosed rate limit issue that was blocking Snag when using Flow EVM via Thirdweb

**This sprint**
* Finalize multi-sign approach for Hyperlane and launch cbBTC bridge
Expand Down

0 comments on commit 0057b62

Please sign in to comment.