Skip to content

build(deps): bump @onecx/integration-interface from 5.3.0 to 5.5.0 #293

build(deps): bump @onecx/integration-interface from 5.3.0 to 5.5.0

build(deps): bump @onecx/integration-interface from 5.3.0 to 5.5.0 #293

Triggered via pull request August 20, 2024 23:14
Status Failure
Total duration 2m 49s
Artifacts 2

build-pr.yml

on: pull_request
pr  /  ...  /  npm build and test
2m 22s
pr / angular / npm build and test
pr  /  ...  /  dependency review
6s
pr / dependency-review / dependency review
pr  /  ...  /  codeql qa
1m 34s
pr / code-ql / codeql qa
pr  /  ...  /  docker build and push
8s
pr / docker / docker build and push
pr  /  ...  /  helm build and push
pr / helm / helm build and push
Fit to window
Zoom out
Zoom in

Annotations

1 error and 1 warning
pr / docker / docker build and push
Error response from daemon: toomanyrequests: You have reached your pull rate limit. You may increase the limit by authenticating and upgrading: https://www.docker.com/increase-rate-limit
pr / code-ql / codeql qa
1 issue was detected with this workflow: Please specify an on.push hook to analyze and see code scanning alerts from the default branch on the Security tab.

Artifacts

Produced during runtime
Name Size
github-action-pr Expired
160 Bytes
package Expired
2.97 MB