Skip to content

Fix/setup

Fix/setup #1

Triggered via pull request October 8, 2024 19:24
@p-snftp-snft
synchronize #187
fix/setup
Status Failure
Total duration 58s
Artifacts

tox_pytests.yml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (3.9)
Process completed with exit code 1.
build (3.10)
The job was canceled because "_3_9" failed.
build (3.10)
Process completed with exit code 1.
build (3.11)
The job was canceled because "_3_9" failed.
build (3.11)
The operation was canceled.