remove full protobuf requirement for tensorrt ep #18413
Merged
Azure Pipelines / Linux CPU ATen Pipeline
succeeded
Nov 16, 2023 in 12m 10s
Build #20231116.31 succeeded
Details
- Failed: 0 (0.00%)
- Passed: 4,061 (99.95%)
- Other: 2 (0.05%)
- Total: 4,063
Loading