Regression Check #859
This run and associated checks have been archived and are scheduled for deletion.
Learn more about checks retention
regression-check.yml
on: schedule
Matrix: Disney Scenic Rides / Instrumented Tests
Have a magical day
/
Clikt Unit Tests
45s
Have a magical day
/
Clikt Kotlin Lint Checks
37s
Disney Scenic Rides
/
Android Unit Tests
1m 52s
Disney Scenic Rides
/
Android Lint Checks
2m 2s
Disney Scenic Rides
/
Android Kotlin Lint Checks
1m 58s
Save PR Number for Dependabot Automerge
/
Save PR Number for Dependabot Automerge
Annotations
2 errors and 2 warnings
Disney Scenic Rides / Instrumented Tests (33, google_apis, x86_64)
The job running on runner GitHub Actions 2 has exceeded the maximum execution time of 30 minutes.
|
Disney Scenic Rides / Instrumented Tests (33, google_apis, x86_64)
The operation was canceled.
|
Disney Scenic Rides / Instrumented Tests (33, google_apis, x86_64)
Failed to restore: The operation cannot be completed in timeout.
|
Disney Scenic Rides / Instrumented Tests (33, google_apis, x86_64)
No files were found with the provided path: ./**/build/reports/androidTests/connected/**. No artifacts will be uploaded.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
instrumented-tests-results-28
Expired
|
12 KB |
|
kotlin-lint-results
Expired
|
0 Bytes |
|
lint-results
Expired
|
187 KB |
|
unit-tests-results
Expired
|
46.4 KB |
|