feat: support mel.*
attributes
#2001
This run and associated checks have been archived and are scheduled for deletion.
Learn more about checks retention
nix-build.yml
on: pull_request
Matrix: Build and test (macOS)
Matrix: Build and test (Ubuntu)
Annotations
9 errors
Build and test (Ubuntu) (5_0)
Process completed with exit code 1.
|
Build and test (Ubuntu) (4_14)
The job was canceled because "_5_0" failed.
|
Build and test (Ubuntu) (4_14)
The operation was canceled.
|
Build and test (Ubuntu) (4_13)
The job was canceled because "_5_0" failed.
|
Build and test (Ubuntu) (4_13)
The operation was canceled.
|
Build and test (Ubuntu) (5_1)
The job was canceled because "_5_0" failed.
|
Build and test (Ubuntu) (5_1)
The operation was canceled.
|
Build and test (macOS) (5_0)
Canceling since a higher priority waiting request for 'Nix Pipeline-refs/pull/663/merge' exists
|
Build and test (macOS) (5_0)
The operation was canceled.
|