Skip to content

Commit

Permalink
Merge remote-tracking branch 'origin/main'
Browse files Browse the repository at this point in the history
  • Loading branch information
malcolm-dsider committed Apr 23, 2024
2 parents ff16820 + ea9fd9b commit d9ef4a6
Show file tree
Hide file tree
Showing 3 changed files with 51 additions and 20 deletions.
2 changes: 1 addition & 1 deletion README.rst
Original file line number Diff line number Diff line change
Expand Up @@ -100,7 +100,7 @@ Steps:

- Windows::

venv\Scripts\Activate.ps1
venv\Scripts\activate

- macOS/Linux::

Expand Down
37 changes: 19 additions & 18 deletions src/geophires_x/Economics.py
Original file line number Diff line number Diff line change
Expand Up @@ -927,25 +927,26 @@ def __init__(self, model: Model):
AllowableRange=[1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17],
UnitType=Units.NONE,
ErrMessage="assume default well drilling cost correlation (10)",
ToolTipText="""Select the built-in well drilling and completion cost correlation:
1. vertical small diameter, baseline;
2. deviated small diameter, baseline;
3. vertical large diameter, baseline;
4. deviated large diameter, baseline;
5. Simple;
6. vertical small diameter, intermediate1;
7. vertical small diameter, intermediate2;
8. deviated small diameter, intermediate1;
9. deviated small diameter, intermediate2;
10. vertical large diameter, intermediate1;
11. vertical large diameter, intermediate2;
12. deviated large diameter, intermediate1;
13. deviated large diameter, intermediate2;
14. vertical open-hole, small diameter, ideal;
15. deviated liner, small diameter, ideal;
16. vertical open-hole, large diameter, ideal;
17. deviated liner, large diameter, ideal;"""
ToolTipText="Select the built-in well drilling and completion cost correlation: " +
"1. vertical small diameter, baseline; " +
"2. deviated small diameter, baseline; " +
"3. vertical large diameter, baseline; " +
"4. deviated large diameter, baseline; " +
"5. Simple; " +
"6. vertical small diameter, intermediate1; " +
"7. vertical small diameter, intermediate2; " +
"8. deviated small diameter, intermediate1; " +
"9. deviated small diameter, intermediate2; " +
"10. vertical large diameter, intermediate1; " +
"11. vertical large diameter, intermediate2; " +
"12. deviated large diameter, intermediate1; " +
"13. deviated large diameter, intermediate2; " +
"14. vertical open-hole, small diameter, ideal; " +
"15. deviated liner, small diameter, ideal; " +
"16. vertical open-hole, large diameter, ideal; " +
"17. deviated liner, large diameter, ideal"
)

self.DoAddOnCalculations = self.ParameterDict[self.DoAddOnCalculations.Name] = boolParameter(
"Do AddOn Calculations",
DefaultValue=False,
Expand Down
32 changes: 31 additions & 1 deletion src/geophires_x_schema_generator/geophires-request.json
Original file line number Diff line number Diff line change
Expand Up @@ -731,7 +731,7 @@
"category": "Economics"
},
"Well Drilling Cost Correlation": {
"description": "Select the built-in horizontal well drilling and completion cost correlation. 1. vertical small diameter, baseline; 2. deviated small diameter, baseline; 3. vertical large diameter, baseline; 4. deviated large diameter, baseline; 5. Simple; 6. vertical small diameter, intermediate1; 7. vertical small diameter, intermediate2; 8. deviated small diameter, intermediate1; 9. deviated small diameter, intermediate2; 10. vertical large diameter, intermediate1; 11. vertical large diameter, intermediate2; 12. deviated large diameter, intermediate1; 13. deviated large diameter, intermediate2; 14. vertical open-hole, small diameter, ideal; 15. deviated liner, small diameter, ideal; 16. vertical open-hole, large diameter, ideal; 17. deviated liner, large diameter, ideal",
"description": "Select the built-in well drilling and completion cost correlation: 1. vertical small diameter, baseline; 2. deviated small diameter, baseline; 3. vertical large diameter, baseline; 4. deviated large diameter, baseline; 5. Simple; 6. vertical small diameter, intermediate1; 7. vertical small diameter, intermediate2; 8. deviated small diameter, intermediate1; 9. deviated small diameter, intermediate2; 10. vertical large diameter, intermediate1; 11. vertical large diameter, intermediate2; 12. deviated large diameter, intermediate1; 13. deviated large diameter, intermediate2; 14. vertical open-hole, small diameter, ideal; 15. deviated liner, small diameter, ideal; 16. vertical open-hole, large diameter, ideal; 17. deviated liner, large diameter, ideal",
"type": "integer",
"units": null,
"category": "Economics"
Expand Down Expand Up @@ -988,6 +988,36 @@
"units": "",
"category": "Economics"
},
"Production Tax Credit Electricity": {
"description": "Production tax credit for electricity in $/kWh",
"type": "number",
"units": "USD/kWh",
"category": "Economics"
},
"Production Tax Credit Heat": {
"description": "Production tax credit for heat in $/MMBTU",
"type": "number",
"units": "USD/MMBTU",
"category": "Economics"
},
"Production Tax Credit Cooling": {
"description": "Production tax credit for cooling in $/MMBTU",
"type": "number",
"units": "USD/MMBTU",
"category": "Economics"
},
"Production Tax Credit Duration": {
"description": "Production tax credit for duration in years",
"type": "integer",
"units": "yr",
"category": "Economics"
},
"Production Tax Credit Inflation Adjusted": {
"description": "Production tax credit inflation adjusted",
"type": "boolean",
"units": null,
"category": "Economics"
},
"Operation & Maintenance Cost of Surface Plant": {
"description": "",
"type": "number",
Expand Down

0 comments on commit d9ef4a6

Please sign in to comment.