Skip to content

Commit

Permalink
Implementing PTC and ITC more fully
Browse files Browse the repository at this point in the history
Adding test modules for PTC and IC
Fixing unit tests
  • Loading branch information
malcolm-dsider committed Apr 10, 2024
1 parent 269aa89 commit 0800da3
Showing 1 changed file with 1 addition and 2 deletions.
Original file line number Diff line number Diff line change
Expand Up @@ -3,7 +3,7 @@ Created on 2018-06-11
Last modified on 2024-02-28
Geothermal Electricity Problem using a Multiple Parallel Fractures Model

Example 1 Description: This problem considers an EGS reservoir at 3km depth.
Example PTC Description: This problem considers an EGS reservoir at 3km depth.
Ramey's model is applied to simulate production wellbore heat losses. The heat
is used in for electricity application with a reinjection temperature of 50deg.C.

Expand Down Expand Up @@ -81,7 +81,6 @@ Exploration Capital Cost Adjustment Factor,1, --- [-] Use built-in exploration
Wellfield O&M Cost Adjustment Factor,1, --- [-] Use built-in wellfield O&M cost correlation as is
Water Cost Adjustment Factor,1, --- [-] Use built-in water cost correlation as is
Surface Plant O&M Cost Adjustment Factor,1, --- [-] Use built-in surface plant O&M cost correlation as is
Investment Tax Credit Rate,0.5, --- [-] Investment tax credit rate
Production Tax Credit Electricity, 0.05, --- [-] Production tax credit for electricity in $/kWh
Production Tax Credit Heat, 0.05, --- [-] Production tax credit for electricity in $/kWh
Production Tax Credit Cooling, 0.05, --- [-] Production tax credit for electricity in $/kWh
Expand Down

0 comments on commit 0800da3

Please sign in to comment.