Skip to content

chore: update api-extractor packages - abandoned #15717

chore: update api-extractor packages - abandoned

chore: update api-extractor packages - abandoned #15717

Triggered via pull request September 13, 2024 01:43
Status Failure
Total duration 20m 26s
Artifacts

continuous-integration.yml

on: pull_request
Matrix: Test
Post-Test
0s
Post-Test
Fit to window
Zoom out
Zoom in

Annotations

6 errors and 4 warnings
Test (ubuntu-latest, 22)
Process completed with exit code 1.
Test (ubuntu-latest, 20)
Process completed with exit code 1.
Test (windows-latest, 20)
Process completed with exit code 1.
Test (ubuntu-latest, 18)
Process completed with exit code 1.
Test (macos-latest, 20)
The job running on runner GitHub Actions 18 has exceeded the maximum execution time of 20 minutes.
Test (macos-latest, 20)
The operation was canceled.
Test (ubuntu-latest, 18)
Failed to download action 'https://api.github.com/repos/coverallsapp/github-action/tarball/643bc377ffa44ace6394b2b5d0d3950076de9f63'. Error: The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.
Test (ubuntu-latest, 18)
Back off 18.428 seconds before retry.
Test (ubuntu-latest, 18)
Failed to download action 'https://api.github.com/repos/coverallsapp/github-action/tarball/643bc377ffa44ace6394b2b5d0d3950076de9f63'. Error: The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.
Test (ubuntu-latest, 18)
Back off 24.853 seconds before retry.