chore: update dependency @graphql-tools/utils to ^10.5.4 #15711
Triggered via pull request
September 12, 2024 18:57
Status
Failure
Total duration
1h 39m 19s
Artifacts
–
continuous-integration.yml
on: pull_request
Matrix: Test
Test Benchmark
5m 52s
Code Lint
7m 6s
Commit Lint
6m 1s
Verify Docs
6m 25s
Post-Test
0s
Annotations
4 errors
Test (ubuntu-latest, 22)
The job running on runner GitHub Actions 10 has exceeded the maximum execution time of 20 minutes.
|
Test (ubuntu-latest, 22)
The operation was canceled.
|
Test (macos-latest, 20)
The job running on runner GitHub Actions 17 has exceeded the maximum execution time of 20 minutes.
|
Test (macos-latest, 20)
The operation was canceled.
|