chore: update dependency loopback-connector-soap to ^8.0.10 #15708
Triggered via pull request
September 12, 2024 18:56
Status
Failure
Total duration
1h 23m 33s
Artifacts
–
continuous-integration.yml
on: pull_request
Matrix: Test
Test Benchmark
5m 54s
Code Lint
7m 6s
Commit Lint
5m 57s
Verify Docs
6m 9s
Post-Test
0s
Annotations
2 errors
Test (macos-latest, 20)
The job running on runner GitHub Actions 5 has exceeded the maximum execution time of 20 minutes.
|
Test (macos-latest, 20)
The operation was canceled.
|