chore: update dependency loopback-connector-soap to ^8.0.10 #15672
continuous-integration.yml
on: pull_request
Matrix: Test
Test Benchmark
5m 58s
Code Lint
7m 5s
Commit Lint
5m 53s
Verify Docs
6m 11s
Post-Test
0s
Annotations
3 errors
Test (macos-latest, 20)
The job running on runner GitHub Actions 20 has exceeded the maximum execution time of 20 minutes.
|
Test (macos-latest, 20)
The operation was canceled.
|
Test (windows-latest, 20)
Process completed with exit code 1.
|