Test nagfor #680
Triggered via schedule
November 10, 2024 19:05
Status
Success
Total duration
22h 7m 55s
Artifacts
11
test_nagfor.yml
on: schedule
Matrix: Run nagfor tests
check_success_timeout
17s
Annotations
8 errors
Run nagfor tests (i2, bobyqa, big)
The job running on runner zM0 has exceeded the maximum execution time of 360 minutes.
|
Run nagfor tests (i2, bobyqa, big)
The operation was canceled.
|
Run nagfor tests (i2, cobyla, small)
The job running on runner zM1 has exceeded the maximum execution time of 360 minutes.
|
Run nagfor tests (i2, cobyla, small)
The operation was canceled.
|
Run nagfor tests (i2, lincoa, big)
The job running on runner zM0 has exceeded the maximum execution time of 360 minutes.
|
Run nagfor tests (i2, lincoa, big)
The operation was canceled.
|
Run nagfor tests (i2, newuoa, big)
The job running on runner zM1 has exceeded the maximum execution time of 360 minutes.
|
Run nagfor tests (i2, newuoa, big)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
bobyqa-i2-big--O1
|
1.53 KB |
|
bobyqa-i2-big--O1
|
1.53 KB |
|
bobyqa-i2-small--O1
|
255 KB |
|
cobyla-i2-big--O1
|
156 KB |
|
cobyla-i2-small--O1
|
145 KB |
|
lincoa-i2-big--O1
|
111 KB |
|
lincoa-i2-small--O1
|
2.26 MB |
|
newuoa-i2-big--O1
|
10.7 KB |
|
newuoa-i2-small--O1
|
135 KB |
|
uobyqa-i2-big--O1
|
4.01 KB |
|
uobyqa-i2-small--O1
|
281 KB |
|