Test nagfor #641
test_nagfor.yml
on: schedule
Matrix: Run nagfor tests
check_success_timeout
12s
Annotations
4 errors
Run nagfor tests (i2, bobyqa, big)
The job running on runner zM1 has exceeded the maximum execution time of 360 minutes.
|
Run nagfor tests (i2, bobyqa, big)
The operation was canceled.
|
Run nagfor tests (i2, newuoa, big)
The job running on runner zS0 has exceeded the maximum execution time of 360 minutes.
|
Run nagfor tests (i2, newuoa, big)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
bobyqa-i2-big--O3
|
13.8 KB |
|
bobyqa-i2-small--O3
|
110 KB |
|
cobyla-i2-big--O3
|
203 KB |
|
cobyla-i2-small--O3
|
128 KB |
|
lincoa-i2-big--O3
|
440 KB |
|
lincoa-i2-small--O3
|
2.63 MB |
|
newuoa-i2-big--O3
|
10.8 KB |
|
newuoa-i2-small--O3
|
238 KB |
|
uobyqa-i2-big--O3
|
4.43 KB |
|
uobyqa-i2-small--O3
|
461 KB |
|