Skip to content

Build

Build #2626

Triggered via schedule November 6, 2024 04:18
Status Failure
Total duration 2m 12s
Artifacts 2

build.yml

on: schedule
Matrix: Build and test
Publish PHARs
0s
Publish PHARs
Matrix: Run integration tests
Fit to window
Zoom out
Zoom in

Annotations

5 errors
Run integration tests (8.1)
Process completed with exit code 2.
Run integration tests (8.2)
The job was canceled because "_8_1" failed.
Run integration tests (8.2)
Process completed with exit code 2.
Run integration tests (8.3)
The job was canceled because "_8_1" failed.
Run integration tests (8.3)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
devkit.phar
325 KB
toolbox.phar
329 KB