Skip to content

updated integration #11

updated integration

updated integration #11

Triggered via push September 26, 2023 14:33
Status Failure
Total duration 33s
Artifacts

run-tests.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

15 errors
P8.2 - prefer-stable - ubuntu-latest
Process completed with exit code 2.
P8.1 - prefer-lowest - ubuntu-latest
The job was canceled because "ubuntu-latest_8_2_prefe_2" failed.
P8.1 - prefer-lowest - ubuntu-latest
Process completed with exit code 2.
P8.2 - prefer-lowest - windows-latest
The job was canceled because "ubuntu-latest_8_2_prefe_2" failed.
P8.2 - prefer-lowest - windows-latest
The operation was canceled.
P8.1 - prefer-stable - windows-latest
The job was canceled because "ubuntu-latest_8_2_prefe_2" failed.
P8.1 - prefer-stable - windows-latest
The operation was canceled.
P8.1 - prefer-stable - ubuntu-latest
The job was canceled because "ubuntu-latest_8_2_prefe_2" failed.
P8.1 - prefer-stable - ubuntu-latest
The operation was canceled.
P8.2 - prefer-stable - windows-latest
The job was canceled because "ubuntu-latest_8_2_prefe_2" failed.
P8.2 - prefer-stable - windows-latest
The operation was canceled.
P8.1 - prefer-lowest - windows-latest
The job was canceled because "ubuntu-latest_8_2_prefe_2" failed.
P8.1 - prefer-lowest - windows-latest
The operation was canceled.
P8.2 - prefer-lowest - ubuntu-latest
The job was canceled because "ubuntu-latest_8_2_prefe_2" failed.
P8.2 - prefer-lowest - ubuntu-latest
The operation was canceled.