Skip to content

fix(fw): EOF - Fix EXCHANGE's data_portion_length #237

fix(fw): EOF - Fix EXCHANGE's data_portion_length

fix(fw): EOF - Fix EXCHANGE's data_portion_length #237

Triggered via push September 30, 2024 15:31
Status Failure
Total duration 1m 56s
Artifacts

tox_verify.yaml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (ubuntu-24.04, 3.10, stable, uvx --with=tox-uv tox)
Process completed with exit code 1.
build (macos-latest, 3.11, stable, uvx --with=tox-uv tox)
The job was canceled because "ubuntu-24_04_3_10_stable_" failed.
build (macos-latest, 3.11, stable, uvx --with=tox-uv tox)
Process completed with exit code 1.
build (ubuntu-24.04, 3.12, stable, uvx --with=tox-uv tox)
The job was canceled because "ubuntu-24_04_3_10_stable_" failed.
build (ubuntu-24.04, 3.12, stable, uvx --with=tox-uv tox)
The operation was canceled.