Skip to content

fixes status not being updated in CG #91

fixes status not being updated in CG

fixes status not being updated in CG #91

Triggered via push November 1, 2023 12:50
Status Cancelled
Total duration 4m 58s
Artifacts 1

tests.yml

on: push
Matrix: Tests with GLPK
Matrix: Tests with HiGHS
Matrix: Tests with Mosek
Tests with modeling interface
4m 25s
Tests with modeling interface
Upload coverage report
0s
Upload coverage report
Fit to window
Zoom out
Zoom in

Annotations

15 errors
Tests with GLPK (branch-and-price/test_bap_assignment_GLPK)
Process completed with exit code 255.
Tests with GLPK (branch-and-bound/test_bab_knapsack_GLPK)
The job was canceled because "branch-and-price_test_bap" failed.
Tests with GLPK (branch-and-bound/test_bab_knapsack_GLPK)
The operation was canceled.
Tests with HiGHS (branch-and-price/test_bap_assignment_HiGHS)
The operation was canceled.
Tests with HiGHS (branch-and-bound/test_bab_knapsack_HiGHS)
The operation was canceled.
Tests with Mosek (branch-and-price/test_bap_assignment_Mosek)
The operation was canceled.
Tests with Mosek (branch-and-bound/test_bab_location_Mosek)
The operation was canceled.
Tests with HiGHS (branch-and-bound/test_bab_location_HiGHS)
The operation was canceled.
Tests with Mosek (branch-and-bound/test_bab_knapsack_Mosek)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
coverage Expired
7.96 MB