Skip to content

Allow for passing --app or --space to delete drains #5300

Allow for passing --app or --space to delete drains

Allow for passing --app or --space to delete drains #5300

Re-run triggered October 16, 2024 18:52
Status Failure
Total duration 9m 27s
Artifacts

ci.yml

on: push
Matrix: test
Matrix: acceptance
Matrix: integration
Matrix: spell-check
Fit to window
Zoom out
Zoom in

Annotations

5 errors
test (20.x, macos-latest)
Process completed with exit code 1.
test (20.x, windows-latest)
The job was canceled because "_20_x_macos-latest" failed.
test (20.x, windows-latest)
The operation was canceled.
test (20.x, ubuntu-latest)
The job was canceled because "_20_x_macos-latest" failed.
test (20.x, ubuntu-latest)
The operation was canceled.