Skip to content

Merge pull request #140 from georust/issue/139 #278

Merge pull request #140 from georust/issue/139

Merge pull request #140 from georust/issue/139 #278

Triggered via push May 4, 2024 15:42
Status Cancelled
Total duration 2m 14s
Artifacts

ci.yml

on: push
Matrix: conda
Matrix: static builds
Matrix: test apt
Fit to window
Zoom out
Zoom in

Annotations

11 errors
rustfmt
Canceling since a higher priority waiting request for 'CI-refs/heads/master' exists
static builds (macos-latest, stable)
Canceling since a higher priority waiting request for 'CI-refs/heads/master' exists
static builds (macos-latest, stable)
The operation was canceled.
conda (windows, conda-forge, stable)
Canceling since a higher priority waiting request for 'CI-refs/heads/master' exists
conda (windows, conda-forge, stable)
The operation was canceled.
static builds (windows-latest, stable-msvc)
Canceling since a higher priority waiting request for 'CI-refs/heads/master' exists
static builds (windows-latest, stable-msvc)
The operation was canceled.
static builds (windows-latest, stable-gnu)
Canceling since a higher priority waiting request for 'CI-refs/heads/master' exists
static builds (windows-latest, stable-gnu)
The operation was canceled.
static builds (macos-11, stable)
Canceling since a higher priority waiting request for 'CI-refs/heads/master' exists
static builds (macos-11, stable)
The operation was canceled.