Skip to content

continuous-integration #50

continuous-integration

continuous-integration #50

Triggered via schedule October 8, 2023 01:50
Status Failure
Total duration 5m 49s
Artifacts
Skip duplicate runs
4s
Skip duplicate runs
Matrix: smoke test release-* branches when it's a scheduled run
Check changed files
5s
Check changed files
Run linters
21s
Run linters
Run shellcheck linter
6s
Run shellcheck linter
Verify API doc is up to date
1m 51s
Verify API doc is up to date
Verify CRD is up to date
56s
Verify CRD is up to date
Generate jobs for unit tests
4s
Generate jobs for unit tests
Matrix: Run unit tests
Build containers
0s
Build containers
Fit to window
Zoom out
Zoom in

Annotations

5 errors and 1 warning
smoke test release-* branches when it's a scheduled run (release-1.19)
Resource not accessible by integration
smoke test release-* branches when it's a scheduled run (release-1.20)
Resource not accessible by integration
Run unit tests (1.27.x)
Process completed with exit code 2.
Run unit tests (1.24.x)
The job was canceled because "_1_27_x" failed.
Run unit tests (1.24.x)
The operation was canceled.
Check changed files
'before' field is missing in event payload - changes will be detected from last commit