Merge pull request #28 from eriknovak/docs #77
Annotations
10 errors
test (ubuntu-latest, 3.10)
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
|
test (ubuntu-latest, 3.10)
The operation was canceled.
|
test (ubuntu-latest, 3.9)
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
|
test (ubuntu-latest, 3.9)
The operation was canceled.
|
test (ubuntu-latest, 3.11)
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
|
test (ubuntu-latest, 3.11)
The operation was canceled.
|
test (macos-latest, 3.10)
The job running on runner GitHub Actions 24 has exceeded the maximum execution time of 30 minutes.
|
test (macos-latest, 3.10)
The operation was canceled.
|
test (ubuntu-latest, 3.12)
The job running on runner GitHub Actions 16 has exceeded the maximum execution time of 30 minutes.
|
test (ubuntu-latest, 3.12)
The operation was canceled.
|